Filtering facepieces
Filtering Facepieces (FFP) are disposable Respiratory Protective Equipment (RPE) for protection against dusts, particles and aerosols. They are often referred to as 'disposable dust masks', are widely used, and generally require no cleaning or maintenance.
They are available in three classes: FFP1, FFP2 and FFP3, with the higher numbers corresponding to better filtering efficiency.
As with all types of Personal Protective Equipment (PPE) sold in the UK, they must comply with the EU PPE Directive 89/686/EEC. It is the responsibility of the manufacturer or person placing the RPE on the European single market to ensure compliance. For FFPs this is invariably achieved by compliance with the harmonised standard EN149:2001+A1:2009: Respiratory protective devices. Filtering half masks to protect against particles. Requirements, testing, marking.
See also: Performance of FFP3 disposable respirators.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Achieve safety in demolition.
- Asbestos.
- Control of Substances Hazardous to Health (COSHH).
- Deleterious materials.
- Demolition.
- Dust control systems.
- Dust.
- Fit testing.
- Hazardous substances.
- Health and Safety Executive.
- Injuries on construction sites.
- Inspections focus on occupational lung disease.
- Nuisance in construction.
- Performance of FFP3 disposable respirators.
- Personal protective equipment.
- Pollution.
- Reporting accidents and injuries on construction sites.
- Respiratory protective equipment.
- Scabbling.
- The dust control systems market.
- TSI Environmental dust monitoring system.
Featured articles and news
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.